Corporate Office:

2631 Old Charlotte Highway

Monroe, NC 28110

Mailing Address:

PO BOX 929

Monroe, NC 28111

Office: 704-283-7551

Fax: 704-289-8217

info@dellinger-inc.com

Office Hours:

Monday - Friday

8am - 5pm

© 2018 by Dellinger Inc.

LINE DIVISION

Dellinger Incorporated's Line Division was the cornerstone upon which the company was founded in 1972 when we contracted our first job in Rock Hill, SC. We currently work throughout both North and South Carolina on various types of jobs, which include publicly bid jobs as well as privately negotiated work.

Our Line Division experience and qualifications enable us to build and manage turn-key projects that may include the following:

  • Gravity Sewer with manholes and laterals

  • Sewer force main

  • Water main & services

  • Storm drainage pipe

  • Catch basins, Headwalls, Etc

  • Underground water detention systems

  • Bores

  • Install pipe on piers

  • Rock drilling & blasting

  • Site surveying

  • Site clearing

  • Grading

  • Erosion control

  • Paving

  • Curb, Gutter & sidewalk

  • Well pointing & dewatering

LINE TEAM

Todd Price

Division Manager

Todd Price is a 1987 graduate of Fairmont State University. He majored in Civil Engineering. He has 30 years of experience in Site and Utility Construction. Todd has been with Dellinger since 2017.

tprice@dellinger-inc.com

Please reload

Terry Wray

Chief Line Estimator

Terry Wray is the Chief Project Estimator for the Line Division. He is a graduate of the University of North Carolina Charlotte in Civil Engineering Technology. Terry has been with Dellinger since 1983.

terry@dellinger-inc.com

Stuart Hughes

Project Manager

Stuart Hughes is a 2012 Graduate of UNC-Charlotte where he majored in Construction Management. He has been in the construction field for the past seven years working as a Project Manager and Estimator. Stuart has been with Dellinger since 2018.

shughes@dellinger-inc.com

Justin Rogers

Project Manager

Justin Rogers has been with Dellinger Inc. since 2011. He started out as an Equipment Operator and advanced up to a job Superintendent. Now he is a Project Manager for the Line Division.

justin@dellinger-inc.com

Stephen Sizemore

Project Manager

Stephen Sizemore is a Project Manager for the Line Division. Stephen has been with Dellinger since 2019.

ssizemore@dellinger-inc.com

Please reload

PROJECTS

The following is a sample of some private and public jobs that we have completed in recent years.

- Stallings Rd. water main extension 

Union County Public Works - 5,000 LF 12" Water

 

- Little Buffalo Creek sewer improvement

Sanford, NC - 8,000 LF of 24" gravity sewer, 12,00 LF of 18" force main, 725 LF bore

 

- Tega Cay sewer systems improvements

Tega Cay, SC - 15,000 LF of 12" force main, 4,600 LF of 12" gravity main, Parshall flume; 3,000 GPM pump station

 

- Long Creek annexation improvements

Charlotte Mecklengburg Utilities - 8,400 LF of 8" water, 3,700 LF of 8" SS, 1,300 LF of 18" SS, 3,500 LF of 24" SS submersible pump station

Upgrades to Richburg Area Sewer 
         Chester Sewer District
           3395 LF 10-15” Sewer, 2907 LF 10” Force Main and 700 GPM               Pump Station

- Longview Subdivision

Weddington, NC - 259 lots

- Lexington Commons Subdivision

Monroe, NC - 235 lots

 

- Kingstree Subdivision

Charlotte, NC - 696 lots

- The Falls at Weddington

Weddington, NC - 185 lots

- Edgewater Subdivision

Lancaster, SC - 456 lots

PHOTO GALLERY